What you are looking at
The floor prepared for tile: orange uncoupling membrane bonded across the whole bathroom floor, a green laser line struck along the base of the wall, the shower curb formed in mortar, and the drain body set flush.
Stage
Cement board, bonded flange, banded seams and corners. The layer that decides whether the room is sound in fifteen years.